Protestor signs returned

The preferred corridor for the Powerlink transmission lines from the Borumba pumped hydro project to the Woolooga Substation.

Protestors against the preferred corridor of high powered transmission lines from the Borumba Pumped Hydro Project to the Woolooga Substation, […]

Subscribe or Login to see the rest of the content.